ITAC Assessment: NV0047
ITAC logo
ITAC Assessment: NV0047
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product injection molded plastic parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 78
Plant Area 114,000
ft2
Annual Production 1,500,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $229,978 3,606,389
kWh
Electricity Demand $63,273 8,037
kW-mo/yr
Electricity Fees $4,604 -
Natural Gas $14,530 2,598
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,082 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $9,314 $384 n/a $8,438
187,866
kWh
$876
-
kW-mo/yr
- - - -
02 2.6218: Turn off equipment when not in use $5,385 - n/a $1,509
33,705
kWh
$3,876
-
kW-mo/yr
- - - -
03 2.7111: Reduce illumination to minimum necessary levels $1,942 - n/a $1,469
32,825
kWh
$473
-
kW-mo/yr
- - - -
04 2.4221: Install compressor air intakes in coolest locations $837 $140 n/a $837
21,395
kWh
- - - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,297 $200 n/a $1,297
29,015
kWh
- - - - -
06 2.2511: Insulate bare equipment $3,633 $3,730 n/a - - - $3,633
-
MMBtu
- -
07 2.3212: Optimize plant power factor $404 $1,296 n/a - - $404 - - -
08 2.7243: Improve air circulation with destratification fans / other methods $1,959 $6,500 n/a - - - $1,959
-
MMBtu
- -
09 3.4116: Meter recycled water (to reduce sewer charges) $675 $120 n/a - - - - $675
-
Tgal
-
10 3.5315: Lease / purchase baler; sell cardboard to recycler $6,636 $425 n/a - - - - - $6,636
-
lb
TOTAL RECOMMENDED $32,082 $12,795 $13,550
304,806
kWh
$5,225
-
kW-mo/yr
$404 $5,592
-
MMBtu
$675
-
Tgal
$6,636
-
lb
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs