ITAC Assessment: WI0459
ITAC logo
ITAC Assessment: WI0459
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Enzymes
NAICS 325414: Biological Product (except Diagnostic) Manufacturing
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 121,000
ft2
Annual Production 4,400
lb
Production Hrs. Annual 4,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $171,114 5,249,600
kWh
Electricity Demand $117,181 11,282
kW-mo/yr
Electricity Fees $38,908 -
Natural Gas $208,337 30,108
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,492 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $340

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2211: Use optimum temperature $17,598 $4,500 - - $17,598
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $13,519 $26,871 n/a $6,676
194,060
kWh
$6,843
-
kW-mo/yr
-
03 4.111: Add equipment/ operators to reduce production bottleneck $11,712 $11,250 n/a - - $11,712
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $340 $640 $340
9,874
kWh
- -
05 4.111: Add equipment/ operators to reduce production bottleneck $323 $1,206 $323
9,391
kWh
- -
TOTAL RECOMMENDED $43,492 $44,467 $7,339
213,325
kWh
$6,843
-
kW-mo/yr
$29,310
-
MMBtu
TOTAL IMPLEMENTED $340 $640 $340
9,874
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs