Assessment Year | 2004 |
---|---|
Principal Product | Enzymes |
NAICS | 325414: Biological Product (except Diagnostic) Manufacturing |
SIC | 2869: Industrial Organic Chemicals, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
121,000
ft2
|
Annual Production | 4,400
lb
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $171,114 | 5,249,600 |
kWh
|
$0.033 |
Electricity Demand | $117,181 | 11,282 |
kW-mo/yr
|
$10.39 |
Electricity Fees | $38,908 | - |
|
- |
Natural Gas | $208,337 | 30,108 |
MMBtu
|
$6.92 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $43,492 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $340 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2211: Use optimum temperature | $17,598 | $4,500 | - | - |
$17,598
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,519 | $26,871 | n/a |
$6,676
194,060
kWh
|
$6,843
-
kW-mo/yr
|
- |
03 | 4.111: Add equipment/ operators to reduce production bottleneck | $11,712 | $11,250 | n/a | - | - |
$11,712
-
MMBtu
|
04 | 2.4221: Install compressor air intakes in coolest locations | $340 | $640 |
$340
9,874
kWh
|
- | - | |
05 | 4.111: Add equipment/ operators to reduce production bottleneck | $323 | $1,206 |
$323
9,391
kWh
|
- | - | |
TOTAL RECOMMENDED | $43,492 | $44,467 |
$7,339
213,325
kWh
|
$6,843
-
kW-mo/yr
|
$29,310
-
MMBtu
|
||
TOTAL IMPLEMENTED | $340 | $640 |
$340
9,874
kWh
|
- | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs