Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $204,335 | 6,815,077 |
kWh
|
$0.030 |
Electricity Demand | $127,396 | 14,086 |
kW-mo/yr
|
$9.04 |
Electricity Fees | $13,555 | - |
|
- |
Natural Gas | $406,731 | 64,109 |
MMBtu
|
$6.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $93,859 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,162 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2437: Recover waste heat from equipment | $47,771 | $18,500 | - | - |
$47,771
-
MMBtu
|
- | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $22,445 | $40,000 |
$33,699
1,063,050
kWh
|
$19,463
-
kW-mo/yr
|
$(-30,717.0)
-
MMBtu
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,041 | $18,315 |
$7,513
237,018
kWh
|
$4,528
-
kW-mo/yr
|
- | - | |
04 | 3.4114: Replace city water with recycled water via cooling tower | $3,824 | $8,700 |
$(-1,137.0)
(-22,380)
kWh
|
- | - |
$4,961
-
Tgal
|
|
05 | 2.4221: Install compressor air intakes in coolest locations | $3,121 | $1,280 |
$2,147
67,724
kWh
|
$974
-
kW-mo/yr
|
- | - | |
06 | 2.2622: Replace existing chiller with high efficiency model | $4,657 | $20,000 |
$2,906
91,665
kWh
|
$1,751
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $93,859 | $106,795 |
$45,128
1,437,077
kWh
|
$26,716
-
kW-mo/yr
|
$17,054
-
MMBtu
|
$4,961
-
Tgal
|
||
TOTAL IMPLEMENTED | $15,162 | $19,595 |
$9,660
304,742
kWh
|
$5,502
-
kW-mo/yr
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs