ITAC Assessment: WI0443
ITAC logo
ITAC Assessment: WI0443
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product ceramic disc capacitors
NAICS 334416: Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
SIC 3675: Electronic Capacitors
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 100,000
ft2
Annual Production 500,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,837 4,989,296
kWh
Electricity Demand $84,621 9,086
kW-mo/yr
Electricity Fees $32,228 -
Natural Gas $52,221 9,448
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,367 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,524

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2426: Use waste heat from flue gases to heat space conditioning air $3,583 $9,000 - - $3,583
-
MMBtu
02 2.1241: Reduce excessive boiler blowdown $1,964 $4,500 - - $1,964
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $1,215 $500 - - $1,215
-
MMBtu
04 2.7135: Install occupancy sensors $843 $2,500 $843
30,213
kWh
- -
05 2.4221: Install compressor air intakes in coolest locations $421 $640 $216
7,742
kWh
$205
-
kW-mo/yr
-
06 2.7135: Install occupancy sensors $341 $75 $341
12,240
kWh
- -
TOTAL RECOMMENDED $8,367 $17,215 $1,400
50,195
kWh
$205
-
kW-mo/yr
$6,762
-
MMBtu
TOTAL IMPLEMENTED $7,524 $14,715 $557
19,982
kWh
$205
-
kW-mo/yr
$6,762
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs