ITAC Assessment: WI0441
ITAC logo
ITAC Assessment: WI0441
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Screen Printing
NAICS 323113: Commercial Screen Printing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 125,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,475
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,847 1,569,640
kWh
Electricity Demand $40,995 5,032
kW-mo/yr
Electricity Fees $8,402 -
Natural Gas $44,817 10,442
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,417 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,200

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 3.2176: Increase use of automation $66,563 $30,000 $(-383.0)
(-10,015)
kWh
- - $66,946 -
02 2.1221: Replace obsolete burners with more efficient ones $5,650 $16,800 - - $5,650
-
MMBtu
- -
03 3.7137: Replace cloth rags with paper towels $2,550 - - - - - $2,550
04 2.3137: Use power during off-peak periods $1,486 - - $1,486
-
kW-mo/yr
- - -
05 2.4221: Install compressor air intakes in coolest locations $168 $640 $116
3,035
kWh
$52
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $76,417 $47,440 $(-267.0)
(-6,980)
kWh
$1,538
-
kW-mo/yr
$5,650
-
MMBtu
$66,946 $2,550
TOTAL IMPLEMENTED $8,200 $16,800 - - $5,650
-
MMBtu
- $2,550
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs