ITAC Assessment: WI0435
ITAC logo
ITAC Assessment: WI0435
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product homogenizer
NAICS 333241: Food Product Machinery Manufacturing
SIC 3556: Food Products Machinery
Sales Range $10
M
to 50
M
# of Employees 133
Plant Area 455,000
ft2
Annual Production 75
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $257,167 8,268,811
kWh
Electricity Demand $123,615 17,731
kW-mo/yr
Electricity Fees $18,847 -
Natural Gas $111,061 24,195
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $157,786 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,309

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 4.445: Install equipment to move product $149,500 $120,000 - - - $149,500
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,988 - - $3,988
-
kW-mo/yr
- -
03 2.2414: Use waste heat from hot flue gases to preheat $2,286 $10,000 n/a - - $2,286
-
MMBtu
-
04 2.4224: Upgrade controls on compressors $1,321 $5,000 $1,321
40,284
kWh
- - -
05 2.4221: Install compressor air intakes in coolest locations $691 $640 $362
11,033
kWh
$329
-
kW-mo/yr
- -
TOTAL RECOMMENDED $157,786 $135,640 $1,683
51,317
kWh
$4,317
-
kW-mo/yr
$2,286
-
MMBtu
$149,500
TOTAL IMPLEMENTED $5,309 $5,000 $1,321
40,284
kWh
$3,988
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs