ITAC Assessment: ND0154
ITAC logo
ITAC Assessment: ND0154
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Aluminum Die Castings
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $10
M
to 50
M
# of Employees 190
Plant Area 150,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,600
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $395,787 10,215,709
kWh
Natural Gas $232,391 72,653
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,374 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,391

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $2,798 $3,829 $2,798
72,098
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,831 $2,000 $7,831
202,227
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,650 $1,741 $4,650
120,164
kWh
04 2.7135: Install occupancy sensors $2,088 $800 $2,088
53,927
kWh
05 2.4221: Install compressor air intakes in coolest locations $1,112 $200 $1,112
28,722
kWh
06 2.4221: Install compressor air intakes in coolest locations $638 $200 $638
19,050
kWh
07 2.7122: Disconnect ballasts $193 $200 $193
4,982
kWh
08 2.7142: Utilize higher efficiency lamps and/or ballasts $64 $120 $64
1,758
kWh
TOTAL RECOMMENDED $19,374 $9,090 $19,374
502,928
kWh
TOTAL IMPLEMENTED $9,391 $6,170 $9,391
245,016
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs