| Assessment Year | 1993 |
|---|---|
| Principal Product | Aluminum Die Castings |
| NAICS |
n/a
|
| SIC | 3363: Aluminum Die-Castings |
| Sales Range | $10 M to 50M |
| # of Employees | 190 |
| Plant Area |
150,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 6,600
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $395,787 | 10,215,709 |
kWh
|
$0.039 |
| Natural Gas | $232,391 | 72,653 |
MMBtu
|
$3.20 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $19,374 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $9,391 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $2,798 | $3,829 |
$2,798
72,098
kWh
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,831 | $2,000 |
$7,831
202,227
kWh
|
|
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,650 | $1,741 |
$4,650
120,164
kWh
|
|
| 04 | 2.7135: Install occupancy sensors | $2,088 | $800 |
$2,088
53,927
kWh
|
|
| 05 | 2.4221: Install compressor air intakes in coolest locations | $1,112 | $200 |
$1,112
28,722
kWh
|
|
| 06 | 2.4221: Install compressor air intakes in coolest locations | $638 | $200 |
$638
19,050
kWh
|
|
| 07 | 2.7122: Disconnect ballasts | $193 | $200 |
$193
4,982
kWh
|
|
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $64 | $120 |
$64
1,758
kWh
|
|
| TOTAL RECOMMENDED | $19,374 | $9,090 |
$19,374
502,928
kWh
|
||
| TOTAL IMPLEMENTED | $9,391 | $6,170 |
$9,391
245,016
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs