| Assessment Year | 2018 |
|---|---|
| Principal Product | Wheelchair accessories |
| NAICS | 339999: All Other Miscellaneous Manufacturing |
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 125 |
| Plant Area |
50,000
ft2
|
| Annual Production | 1,500,000
pieces
|
| Production Hrs. Annual | 6,024
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $95,535 | 939,696 |
kWh
|
$0.10 | |
| Electricity Demand | $6,494 | 3,243 |
kW-mo/yr
|
$2.00 | |
| Waste Disposal Costs | |||||
| Water Usage | $5,419 | 775 |
Tgal
|
$6.99 | |
| Water Disposal | $5,820 | 775 |
Tgal
|
$7.51 | |
| TOTAL YEARLY COSTS | $113,268 | ||||
| RECOMMENDED SAVINGS* | $5,660 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $3,360 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.611: Begin a practice of predictive / preventative maintenance | $450 | $1,970 |
$880
8,500
kWh
|
$60
-
kW-mo/yr
|
$590 | $(-1,080.0) | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,310 | $3,750 |
$1,180
11,300
kWh
|
$130
-
kW-mo/yr
|
- | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,175 | $500 |
$1,130
10,840
kWh
|
$45
-
kW-mo/yr
|
- | - | |
| 04 | 2.4239: Eliminate or reduce compressed air usage | $1,040 | $1,070 |
$1,040
10,000
kWh
|
- | - | - | |
| 05 | 2.7135: Install occupancy sensors | $555 | $540 |
$555
5,350
kWh
|
- | - | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $425 | $205 |
$122
1,180
kWh
|
$3
-
kW-mo/yr
|
$300 | - | |
| 07 | 2.7111: Reduce illumination to minimum necessary levels | $450 | $30 |
$430
4,130
kWh
|
$20
-
kW-mo/yr
|
- | - | |
| 08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $255 | $4 |
$235
2,250
kWh
|
$20
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $5,660 | $8,069 |
$5,572
53,550
kWh
|
$278
-
kW-mo/yr
|
$890 | $(-1,080.0) | ||
| TOTAL IMPLEMENTED | $3,360 | $4,485 |
$2,862
27,450
kWh
|
$198
-
kW-mo/yr
|
$300 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs