ITAC Assessment: WI0434
ITAC logo
ITAC Assessment: WI0434
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product stainless utensils
NAICS
n/a
SIC 3421: Cutlery
Sales Range $100
M
to 500
M
# of Employees 500
Plant Area 610,000
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $272,521 12,700,800
kWh
Electricity Demand $203,106 27,223
kW-mo/yr
Electricity Fees $135,852 -
Natural Gas $435,878 107,033
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $156,166 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,915

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings
01 3.3132: Use reverse osmosis to concentrate material $133,384 $140,000 $(-2,400.0)
(-50,000)
kWh
- $142,284
-
Tgal
$(-6,500.0)
02 2.7135: Install occupancy sensors $9,841 $25,000 $4,935
219,324
kWh
$4,906
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $5,168 $11,700 $5,168
229,698
kWh
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,746 $12,600 $3,746
166,507
kWh
- - -
05 2.4221: Install compressor air intakes in coolest locations $1,556 $740 $931
41,382
kWh
$625
-
kW-mo/yr
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,280 $2,832 $806
35,808
kWh
$474
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,191 $588 $702
31,200
kWh
$489
-
kW-mo/yr
- -
TOTAL RECOMMENDED $156,166 $193,460 $13,888
673,919
kWh
$6,494
-
kW-mo/yr
$142,284
-
Tgal
$(-6,500.0)
TOTAL IMPLEMENTED $7,915 $13,028 $6,801
302,280
kWh
$1,114
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs