Assessment Year | 2002 |
---|---|
Principal Product | Comp. Air Controls |
NAICS |
n/a
|
SIC | 3567: Industrial Process Furnaces and Ovens |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
50,000
ft2
|
Annual Production | 5,750
units
|
Production Hrs. Annual | 2,125
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $18,824 | 552,240 |
kWh
|
$0.034 |
Electricity Demand | $30,562 | 2,954 |
kW-mo/yr
|
$10.35 |
Electricity Fees | $5,005 | - |
|
- |
Natural Gas | $22,780 | 26,194 |
MMBtu
|
$0.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $74,909 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,830 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.621: Use fixtures to reduce machine changeout times | $66,300 | $1,000 | - | - | - | $66,300 | - | |
02 | 2.7224: Reduce space conditioning during non-working hours | $4,439 | $400 | - | - |
$4,439
-
MMBtu
|
- | - | |
03 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $2,046 | $1,000 | - | - | - | - | $2,046 | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,091 | $3,136 |
$493
13,689
kWh
|
$598
-
kW-mo/yr
|
- | - | - | |
05 | 2.7314: Reduce ventilation air | $522 | $500 |
$492
57
kWh
|
$30
-
kW-mo/yr
|
- | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $391 | $740 |
$70
1,935
kWh
|
$321
-
kW-mo/yr
|
- | - | - | |
07 | 2.7135: Install occupancy sensors | $120 | - |
$58
1,598
kWh
|
$62
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $74,909 | $6,776 |
$1,113
17,279
kWh
|
$1,011
-
kW-mo/yr
|
$4,439
-
MMBtu
|
$66,300 | $2,046 | ||
TOTAL IMPLEMENTED | $4,830 | $1,140 |
$70
1,935
kWh
|
$321
-
kW-mo/yr
|
$4,439
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs