ITAC Assessment: MU0032
ITAC logo
ITAC Assessment: MU0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Barrels of beer
NAICS 312120: Breweries
SIC 2082: Malt Beverages
Sales Range $1
M
to 5
M
# of Employees 10
Plant Area 9,000
ft2
Annual Production 12,000
units
Production Hrs. Annual 3,900
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $17,165 175,880
kWh
Electricity Demand $14,200 660
kW-mo/yr
Electricity Fees $3,666 -
Natural Gas $21,168 2,176
MMBtu
Waste Disposal Costs
Water Usage $1 1
Tgal
TOTAL YEARLY COSTS $56,200
RECOMMENDED SAVINGS* $1,825 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $500

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $465 - $334
2,780
kWh
$131
-
kW-mo/yr
-
02 2.2511: Insulate bare equipment $505 $398 - - $505
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $36 $126 $36
298
kWh
- -
04 2.7491: Insulate glazing, walls, ceilings, and roofs $780 $219 - - $780
-
MMBtu
05 2.7492: Use proper thickness of insulation on building envelope $39 $67 - - $39
-
MMBtu
TOTAL RECOMMENDED $1,825 $810 $369
3,078
kWh
$131
-
kW-mo/yr
$1,324
-
MMBtu
TOTAL IMPLEMENTED $500 $126 $369
3,078
kWh
$131
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs