Assessment Year | 2002 |
---|---|
Principal Product | Steel |
NAICS |
n/a
|
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
60,000
ft2
|
Annual Production | 875,000
lb
|
Production Hrs. Annual | 2,200
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $27,555 | 774,900 |
kWh
|
$0.036 |
Electricity Demand | $21,653 | 3,686 |
kW-mo/yr
|
$5.87 |
Electricity Fees | $4,958 | - |
|
- |
Natural Gas | $77,290 | 28,233 |
MMBtu
|
$2.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,556 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,389 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 3.5311: Recover and reuse waste material | $2,010 | $8,000 | - | - | - |
$3,885
-
gal
|
- | $(-1,875.0) | |
02 | 2.7261: Install timers and/or thermostats | $3,608 | $400 | - | - |
$3,608
-
MMBtu
|
- | - | - | |
03 | 2.7243: Improve air circulation with destratification fans / other methods | $2,968 | - |
$58
(-1,553)
kWh
|
- |
$2,910
-
MMBtu
|
- | - | - | |
04 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $2,080 | - | - | - | - | - |
$2,080
-
lb
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,925 | $90 |
$1,154
30,687
kWh
|
$771
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,387 | - | - |
$1,387
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,411 | $6,600 |
$844
22,444
kWh
|
$567
-
kW-mo/yr
|
- | - | - | - | |
08 | 3.7137: Replace cloth rags with paper towels | $690 | - | - | - | - | - |
$690
-
lb
|
- | |
09 | 2.2437: Recover waste heat from equipment | $477 | - | - | - |
$477
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $16,556 | $15,090 |
$2,056
51,578
kWh
|
$2,725
-
kW-mo/yr
|
$6,995
-
MMBtu
|
$3,885
-
gal
|
$2,770
-
lb
|
$(-1,875.0) | ||
TOTAL IMPLEMENTED | $10,389 | $7,090 |
$2,056
51,578
kWh
|
$1,338
-
kW-mo/yr
|
$6,995
-
MMBtu
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs