ITAC Assessment: WI0416
ITAC logo
ITAC Assessment: WI0416
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Steel
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 60,000
ft2
Annual Production 875,000
lb
Production Hrs. Annual 2,200
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,555 774,900
kWh
Electricity Demand $21,653 3,686
kW-mo/yr
Electricity Fees $4,958 -
Natural Gas $77,290 28,233
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,556 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,389

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 3.5311: Recover and reuse waste material $2,010 $8,000 - - - $3,885
-
gal
- $(-1,875.0)
02 2.7261: Install timers and/or thermostats $3,608 $400 - - $3,608
-
MMBtu
- - -
03 2.7243: Improve air circulation with destratification fans / other methods $2,968 - $58
(-1,553)
kWh
- $2,910
-
MMBtu
- - -
04 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,080 - - - - - $2,080
-
lb
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,925 $90 $1,154
30,687
kWh
$771
-
kW-mo/yr
- - - -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,387 - - $1,387
-
kW-mo/yr
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,411 $6,600 $844
22,444
kWh
$567
-
kW-mo/yr
- - - -
08 3.7137: Replace cloth rags with paper towels $690 - - - - - $690
-
lb
-
09 2.2437: Recover waste heat from equipment $477 - - - $477
-
MMBtu
- - -
TOTAL RECOMMENDED $16,556 $15,090 $2,056
51,578
kWh
$2,725
-
kW-mo/yr
$6,995
-
MMBtu
$3,885
-
gal
$2,770
-
lb
$(-1,875.0)
TOTAL IMPLEMENTED $10,389 $7,090 $2,056
51,578
kWh
$1,338
-
kW-mo/yr
$6,995
-
MMBtu
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs