Assessment Year | 2002 |
---|---|
Principal Product | Hinges & Tubler Parts |
NAICS |
n/a
|
SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
Sales Range | $10 M to 50M |
# of Employees | 128 |
Plant Area |
102,000
ft2
|
Annual Production | 2,400,000,000
pieces
|
Production Hrs. Annual | 4,375
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $136,077 | 2,215,714 |
kWh
|
$0.061 |
Electricity Demand | $52,466 | 5,058 |
kW-mo/yr
|
$10.37 |
Electricity Fees | $4,633 | - |
|
- |
Natural Gas | $78,524 | 9,549 |
MMBtu
|
$8.22 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $35,399 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,780 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7224: Reduce space conditioning during non-working hours | $13,469 | $1,800 | - | - |
$13,469
-
MMBtu
|
- | |
02 | 3.4114: Replace city water with recycled water via cooling tower | $6,619 | $14,000 |
$(-1,103.0)
(-16,319)
kWh
|
- | - |
$7,722
-
Tgal
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,225 | - |
$2,386
63,462
kWh
|
$1,839
-
kW-mo/yr
|
- | - | |
04 | 2.7243: Improve air circulation with destratification fans / other methods | $4,730 | - |
$201
5,359
kWh
|
- |
$4,529
-
MMBtu
|
- | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,560 | $1,033 | - | - |
$2,560
-
MMBtu
|
- | |
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,971 | - | - |
$1,971
-
kW-mo/yr
|
- | - | |
07 | 2.7135: Install occupancy sensors | $1,071 | $2,400 |
$523
13,897
kWh
|
$548
-
kW-mo/yr
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $754 | $350 |
$510
13,563
kWh
|
$244
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $35,399 | $19,583 |
$2,517
79,962
kWh
|
$4,602
-
kW-mo/yr
|
$20,558
-
MMBtu
|
$7,722
-
Tgal
|
||
TOTAL IMPLEMENTED | $10,780 | $2,750 |
$3,620
96,281
kWh
|
$2,631
-
kW-mo/yr
|
$4,529
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs