ITAC Assessment: WI0401
ITAC logo
ITAC Assessment: WI0401
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Lithographic and Digital Printed Products
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 207
Plant Area 164,458
ft2
Annual Production 3,091,102
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,349 2,857,860
kWh
Electricity Demand $89,915 8,980
kW-mo/yr
Electricity Fees $10,732 -
Natural Gas $22,552 2,905
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,099 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
01 4.611: Begin a practice of predictive / preventative maintenance $19,395 $4,200 n/a $807
24,170
kWh
- - - $(-1,296.0) $1,884 $18,000
02 3.6192: Use a less expensive method of waste removal $17,235 - n/a - - - $17,235
-
lb
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,721 $18,589 n/a $4,355
130,401
kWh
$2,366
-
kW-mo/yr
- - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $587 - n/a $405
12,126
kWh
$182
-
kW-mo/yr
- - - - -
05 2.7135: Install occupancy sensors $1,659 $4,300 n/a $1,144
34,263
kWh
$515
-
kW-mo/yr
- - - - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,147 $2,563 n/a $3,551
106,305
kWh
$1,596
-
kW-mo/yr
- - - - -
07 4.515: Install shelves / racks to utilize unused space $4,050 $13,334 n/a - - - - $4,050 - -
08 2.7261: Install timers and/or thermostats $3,106 $2,600 n/a - - $3,106
-
MMBtu
- - - -
09 2.4221: Install compressor air intakes in coolest locations $2,860 $1,920 n/a $1,995
59,736
kWh
$865
-
kW-mo/yr
- - - - -
10 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,339 $2,000 n/a $1,208
36,175
kWh
$1,131
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $63,099 $49,506 $13,465
403,176
kWh
$6,655
-
kW-mo/yr
$3,106
-
MMBtu
$17,235
-
lb
$2,754 $1,884 $18,000
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs