Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Printed Plastic Packaging
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 30,000
ft2
Annual Production 3,600,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,364 1,577,203
kWh
Electricity Demand $31,944 3,612
kW-mo/yr
Electricity Fees $5,628 -
Natural Gas $50,718 8,330
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,164 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 3.8142: Distill contaminated solvents for reuse $19,159 $14,000 n/a - - - - $28,706
-
gal
$(-2,368.0)
-
lb
$(-7,179.0) -
02 3.4114: Replace city water with recycled water via cooling tower $10,173 $19,500 n/a $(-515.0)
(-14,976)
kWh
$(-280.0)
-
kW-mo/yr
- $10,968
-
Tgal
- - - -
03 2.2426: Use waste heat from flue gases to heat space conditioning air $9,162 $11,500 n/a - - $9,162
-
MMBtu
- - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,714 $7,393 n/a $1,218
35,388
kWh
$496
-
kW-mo/yr
- - - - - -
05 2.7135: Install occupancy sensors $147 $75 n/a $147
4,263
kWh
- - - - - - -
06 3.7131: Use a rag recycle service $1,404 - n/a - - - - - - - $1,404
07 2.4221: Install compressor air intakes in coolest locations $820 $640 n/a $583
16,955
kWh
$237
-
kW-mo/yr
- - - - - -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $585 $403 n/a $428
12,433
kWh
$157
-
kW-mo/yr
- - - - - -
TOTAL RECOMMENDED $43,164 $53,511 $1,861
54,063
kWh
$610
-
kW-mo/yr
$9,162
-
MMBtu
$10,968
-
Tgal
$28,706
-
gal
$(-2,368.0)
-
lb
$(-7,179.0) $1,404
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs