ITAC Assessment: OR0440
ITAC logo
ITAC Assessment: OR0440
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Frozen Onions, Peppers
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 27,520
ft2
Annual Production 62,900,000
lb
Production Hrs. Annual 8,211
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $453,824 11,793,346
kWh
Electricity Demand $61,811 23,328
kW-mo/yr
Electricity Fees $30,560 -
Natural Gas $140,358 25,498
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,896,665 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,877,400

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $1,842,800 $348,000 $(-37,200.0)
(-1,279,500)
kWh
- - $(-187,000.0) $(-1,163,000.0) $3,230,000
02 4.423: Move product using mechanical means $15,000 $75 - - - $15,000 - -
03 2.2621: Modify refrigeration system to operate at a lower pressure $16,500 $5,130 $16,500
567,000
kWh
- - - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,500 - $3,000
103,000
kWh
$500
-
kW-mo/yr
- - - -
05 2.1231: Establish burner maintenance schedule for boilers $2,600 $700 - - $2,600
-
MMBtu
- - -
06 2.7132: Install timers on light switches in little used areas $765 $1,300 $765
26,080
kWh
- - - - -
07 2.4133: Use most efficient type of electric motors $15,500 $38,200 $12,600
427,000
kWh
$2,900
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $1,896,665 $393,405 $(-4,335.0)
(-156,420)
kWh
$3,400
-
kW-mo/yr
$2,600
-
MMBtu
$(-172,000.0) $(-1,163,000.0) $3,230,000
TOTAL IMPLEMENTED $1,877,400 $392,030 $(-8,100.0)
(-285,500)
kWh
$2,900
-
kW-mo/yr
$2,600
-
MMBtu
$(-187,000.0) $(-1,163,000.0) $3,230,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs