ITAC Assessment: WI0392
ITAC logo
ITAC Assessment: WI0392
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Culture and Natural Extracts
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 55,956
ft2
Annual Production 0
units
Production Hrs. Annual 6,400
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $202,882 6,654,969
kWh
Electricity Demand $124,645 14,210
kW-mo/yr
Electricity Fees $23,748 -
Natural Gas $120,289 22,233
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,014 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $122

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $20,043 - - - - $20,043
02 2.2621: Modify refrigeration system to operate at a lower pressure $17,182 $51,500 $11,338
352,123
kWh
$5,844
-
kW-mo/yr
- -
03 2.2414: Use waste heat from hot flue gases to preheat $4,793 $10,000 - - $4,793
-
MMBtu
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,072 $945 $1,637
50,827
kWh
$435
-
kW-mo/yr
- -
05 3.6192: Use a less expensive method of waste removal $1,543 - - - - $1,543
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,457 $7,101 $1,020
31,676
kWh
$437
-
kW-mo/yr
- -
07 2.7135: Install occupancy sensors $579 $200 $579
17,971
kWh
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $122 - $87
2,707
kWh
$35
-
kW-mo/yr
- -
09 2.4221: Install compressor air intakes in coolest locations $223 $640 $97
3,012
kWh
$126
-
kW-mo/yr
- -
TOTAL RECOMMENDED $48,014 $70,386 $14,758
458,316
kWh
$6,877
-
kW-mo/yr
$4,793
-
MMBtu
$21,586
TOTAL IMPLEMENTED $122 - $87
2,707
kWh
$35
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs