Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Bag Making Equipment
NAICS
n/a
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 40,200
ft2
Annual Production 30
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $20,701 710,141
kWh
Electricity Demand $9,950 1,913
kW-mo/yr
Electricity Fees $1,750 -
Natural Gas $8,878 1,716
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,279 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,956

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 3.2123: Convert to high volume low pressure (hvlp) paint guns $2,193 $1,000 - - - - - $2,193
02 2.7261: Install timers and/or thermostats $1,900 $1,000 - - $1,900
-
MMBtu
- - -
03 2.8121: Apply for tax-free status for energy purchases $1,195 - - - - - $1,195 -
04 3.8121: Cover containers to minimize evaporative losses $918 $1,000 - - - $900 - $18
05 2.7142: Utilize higher efficiency lamps and/or ballasts $456 $1,895 $325
10,551
kWh
$131
-
kW-mo/yr
- - - -
06 2.7135: Install occupancy sensors $210 $150 $210
6,741
kWh
- - - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $137 $90 $98
3,224
kWh
$39
-
kW-mo/yr
- - - -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $270 $120 $192
6,155
kWh
$78
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $7,279 $5,255 $825
26,671
kWh
$248
-
kW-mo/yr
$1,900
-
MMBtu
$900 $1,195 $2,211
TOTAL IMPLEMENTED $4,956 $4,105 $615
19,930
kWh
$248
-
kW-mo/yr
$1,900
-
MMBtu
- - $2,193
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs