ITAC Assessment: SF0192
ITAC logo
ITAC Assessment: SF0192
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Printed Circuit Board
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 360
Plant Area 62,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,898
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $592,479 6,884,320
kWh
Electricity Demand $117,606 11,668
kW-mo/yr
Natural Gas $5,429 843
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $149,008 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,572 $186 $2,572
34,041
kWh
- - -
02 2.4221: Install compressor air intakes in coolest locations $6,030 $1,146 $6,030
76,767
kWh
- - -
03 2.4235: Remove or close off unneeded compressed air lines $31,559 $9,510 $31,559
416,563
kWh
- - -
04 2.7135: Install occupancy sensors $1,812 $1,920 $1,812
20,315
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $12,968 $19,370 $12,968
167,701
kWh
- - -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,659 $5,800 - $2,659
-
MMBtu
- -
07 3.5311: Recover and reuse waste material $848 - - - $848
-
lb
-
08 3.5217: Reuse / recycle/ sell paper products $7,889 $250 - - $7,889
-
lb
-
09 3.5315: Lease / purchase baler; sell cardboard to recycler $28,112 $16,000 - - $28,112
-
lb
-
10 2.8114: Change rate schedules or other changes in utility service $54,559 $120,000 - - - $54,559
TOTAL RECOMMENDED $149,008 $174,182 $54,941
715,387
kWh
$2,659
-
MMBtu
$36,849
-
lb
$54,559
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs