ITAC Assessment: WI0383
ITAC logo
ITAC Assessment: WI0383
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Canned Vegetables
NAICS
n/a
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $10
M
to 50
M
# of Employees 210
Plant Area 222,810
ft2
Annual Production 4,500,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,365 4,195,193
kWh
Electricity Demand $86,858 9,833
kW-mo/yr
Electricity Fees $16,474 -
Natural Gas $432,410 122,953
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,662 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,695

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.2449: Recover heat from exhausted steam, hot air or hot water $41,291 $72,000 - - $41,291
-
MMBtu
-
02 2.2414: Use waste heat from hot flue gases to preheat $14,801 $20,000 - - $14,801
-
MMBtu
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $7,946 $22,500 - - $7,946
-
MMBtu
-
04 2.3132: Recharge batteries on during off-peak demand periods $4,492 $11,550 - $4,492
-
kW-mo/yr
- -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,875 - - - - $3,875
-
lb
06 2.4221: Install compressor air intakes in coolest locations $1,257 $740 $592
27,550
kWh
$665
-
kW-mo/yr
- -
TOTAL RECOMMENDED $73,662 $126,790 $592
27,550
kWh
$5,157
-
kW-mo/yr
$64,038
-
MMBtu
$3,875
-
lb
TOTAL IMPLEMENTED $13,695 $34,790 $592
27,550
kWh
$5,157
-
kW-mo/yr
$7,946
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs