ITAC Assessment: SJ0002
ITAC logo
ITAC Assessment: SJ0002
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Cable assemblies
NAICS 335929: Other Communication and Energy Wire Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 55,000
ft2
Annual Production 500,000
units
Production Hrs. Annual 4,680
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,817 561,767
kWh
Electricity Demand $25,284 1,616
kW-mo/yr
Natural Gas $6,753 284
MMBtu
TOTAL YEARLY COSTS $158,854
RECOMMENDED SAVINGS* $104,054 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,431

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $72,623 $275,269 $68,798
304,759
kWh
$3,825
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,741 $652 $1,480
6,538
kWh
$261
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $424 $194 $388
1,704
kWh
$36
-
kW-mo/yr
-
04 2.7221: Lower temperature during the winter season and vice-versa $1,185 - - - $1,185
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $22,309 $22,700 $18,264
80,867
kWh
$4,045
-
kW-mo/yr
-
06 2.6212: Turn off equipment during breaks, reduce operating time $5,772 - $5,772
25,317
kWh
- -
TOTAL RECOMMENDED $104,054 $298,815 $94,702
419,185
kWh
$8,167
-
kW-mo/yr
$1,185
-
MMBtu
TOTAL IMPLEMENTED $31,431 $23,546 $25,904
114,426
kWh
$4,342
-
kW-mo/yr
$1,185
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs