ITAC Assessment: WI0380
ITAC logo
ITAC Assessment: WI0380
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Toy Vehicles
NAICS
n/a
SIC 3944: Games, Toys, and Children's Vehicles, Except Dolls and Bicycles
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 420,000
ft2
Annual Production 1,250,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,114 1,379,250
kWh
Electricity Demand $62,762 5,343
kW-mo/yr
Electricity Fees $7,509 -
Natural Gas $82,608 22,985
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $83,378 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 4.441: Install automatic packing equipment $44,625 $68,300 - - - - - - $44,625 -
02 4.446: Automate finishing process $22,313 $2,000 - - - - - - $22,313 -
03 3.4114: Replace city water with recycled water via cooling tower $6,415 $25,000 $(-313.0)
(-8,499)
kWh
$(-509.0)
-
kW-mo/yr
- $7,237
-
Tgal
- - - -
04 3.2123: Convert to high volume low pressure (hvlp) paint guns $3,068 $6,000 - - - - - - - $3,068
05 2.7111: Reduce illumination to minimum necessary levels $576 - $254
6,741
kWh
$322
-
kW-mo/yr
- - - - - -
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,960 - - - - - - $1,960
-
lb
- -
07 3.8142: Distill contaminated solvents for reuse $1,671 - - - - - $1,872
-
gal
$(-33.0)
-
lb
$(-37.0) $(-131.0)
08 3.8121: Cover containers to minimize evaporative losses $1,159 $1,000 - - - - - - $788 $371
09 2.2437: Recover waste heat from equipment $845 $1,000 - - $845
-
MMBtu
- - - - -
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $532 - $203
5,275
kWh
$329
-
kW-mo/yr
- - - - - -
11 2.7447: Install vinyl strip / high speed / air curtain doors $214 $1,020 - $(-7.0)
-
kW-mo/yr
$221
-
MMBtu
- - - - -
TOTAL RECOMMENDED $83,378 $104,320 $144
3,517
kWh
$135
-
kW-mo/yr
$1,066
-
MMBtu
$7,237
-
Tgal
$1,872
-
gal
$1,927
-
lb
$67,689 $3,308
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs