Assessment Year | 2000 |
---|---|
Principal Product | Printed Circuit Boards |
NAICS |
n/a
|
SIC | 3672: Printed Circuit Boards |
Sales Range | $10 M to 50M |
# of Employees | 350 |
Plant Area |
77,000
ft2
|
Annual Production | 1,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $309,754 | 9,055,686 |
kWh
|
$0.034 |
Electricity Demand | $226,443 | 16,094 |
kW-mo/yr
|
$14.07 |
Electricity Fees | $32,812 | - |
|
- |
Natural Gas | $27,441 | 8,115 |
MMBtu
|
$3.38 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $188,252 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,239 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.126: Install sensors to detect defects | $140,160 | $35,000 | - | - | - | - | $140,160 | |
02 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $15,689 | $9,000 | - | - | - |
$16,089
-
lb
|
$(-400.0) | |
03 | 2.2437: Recover waste heat from equipment | $8,048 | $2,000 |
$(-652.0)
(-18,171)
kWh
|
$(-496.0)
-
kW-mo/yr
|
$9,196
-
MMBtu
|
- | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $5,969 | $2,196 |
$4,195
116,940
kWh
|
$1,774
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,581 | $7,397 |
$3,673
102,286
kWh
|
$1,908
-
kW-mo/yr
|
- | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $5,412 | $740 |
$3,920
109,320
kWh
|
$1,492
-
kW-mo/yr
|
- | - | - | |
07 | 3.6192: Use a less expensive method of waste removal | $5,479 | - | - | - | - |
$5,479
-
lb
|
- | |
08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,121 | $1,050 |
$(-44.0)
(-1,172)
kWh
|
- |
$1,165
-
MMBtu
|
- | - | |
09 | 2.8113: Purchase gas directly from a contract gas supplier | $593 | $500 | - | - |
$593
-
MMBtu
|
- | - | |
10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $200 | - |
$141
3,810
kWh
|
$59
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $188,252 | $57,883 |
$11,233
313,013
kWh
|
$4,737
-
kW-mo/yr
|
$10,954
-
MMBtu
|
$21,568
-
lb
|
$139,760 | ||
TOTAL IMPLEMENTED | $27,239 | $18,593 |
$7,868
219,226
kWh
|
$3,682
-
kW-mo/yr
|
- |
$16,089
-
lb
|
$(-400.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs