Assessment Year | 1999 |
---|---|
Principal Product | Die Cast Parts |
NAICS |
n/a
|
SIC | 3325: Steel Foundries, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
160,000
ft2
|
Annual Production | 4,500,000
lb
|
Production Hrs. Annual | 6,600
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $181,011 | 4,327,081 |
kWh
|
$0.042 |
Electricity Demand | $126,951 | 10,434 |
kW-mo/yr
|
$12.17 |
Electricity Fees | $(-16,408.0) | - |
|
- |
Natural Gas | $176,964 | 69,191 |
MMBtu
|
$2.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $112,383 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,718 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $77,392 | $162,000 |
$89,681
1,945,487
kWh
|
$63,242
-
kW-mo/yr
|
$(-75,531.0)
-
MMBtu
|
- | - | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $17,279 | $58,100 |
$17,279
374,853
kWh
|
- | - | - | - | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $7,328 | $3,182 |
$4,965
107,562
kWh
|
$2,363
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,610 | $3,150 |
$(-226.0)
(-4,982)
kWh
|
- |
$2,836
-
MMBtu
|
- | - | - | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $223 | $666 | - | - |
$223
-
MMBtu
|
- | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $2,408 | $640 |
$1,520
33,118
kWh
|
$888
-
kW-mo/yr
|
- | - | - | - | |
07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $2,364 | - | - | - | - |
$2,364
-
lb
|
- | - | |
08 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $1,469 | $500 | - | - | - | - | - | $1,469 | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,205 | $3,856 |
$565
12,309
kWh
|
$640
-
kW-mo/yr
|
- | - | - | - | |
10 | 4.821: Pay bills on time to avoid late fees | $105 | - | - | - | - | - | $105 | - | |
TOTAL RECOMMENDED | $112,383 | $232,094 |
$113,784
2,468,347
kWh
|
$67,133
-
kW-mo/yr
|
$(-72,472.0)
-
MMBtu
|
$2,364
-
lb
|
$105 | $1,469 | ||
TOTAL IMPLEMENTED | $3,718 | $4,496 |
$2,085
45,427
kWh
|
$1,528
-
kW-mo/yr
|
- | - | $105 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs