ITAC Assessment: WI0353
ITAC logo
ITAC Assessment: WI0353
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Aluminum, Bronze, and Copper Alloys
NAICS
n/a
SIC 3366: Copper Foundries
Sales Range $10
M
to 50
M
# of Employees 254
Plant Area 550,190
ft2
Annual Production 14,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $363,578 13,952,228
kWh
Electricity Demand $392,651 43,108
kW-mo/yr
Electricity Fees $73,590 -
Natural Gas $416,938 114,854
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,539 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,478

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings
01 4.821: Pay bills on time to avoid late fees $26,146 - - - - - - - $26,146
02 2.1221: Replace obsolete burners with more efficient ones $21,494 $72,000 - - $21,494
-
MMBtu
- - - -
03 3.3131: Use evaporation to concentrate material $13,199 $16,000 - - $(-1,189.0)
-
MMBtu
- $17,388
-
gal
$(-3,000.0) -
04 3.4114: Replace city water with recycled water via cooling tower $6,159 $22,000 $(-575.0)
(-20,809)
kWh
$(-403.0)
-
kW-mo/yr
- $7,137
-
Tgal
- - -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,879 - - $4,879
-
kW-mo/yr
- - - - -
06 2.4221: Install compressor air intakes in coolest locations $2,440 $640 $1,630
59,203
kWh
$810
-
kW-mo/yr
- - - - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $785 $624 $462
16,706
kWh
$323
-
kW-mo/yr
- - - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $437 $243 $289
10,551
kWh
$148
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $75,539 $111,507 $1,806
65,651
kWh
$5,757
-
kW-mo/yr
$20,305
-
MMBtu
$7,137
-
Tgal
$17,388
-
gal
$(-3,000.0) $26,146
TOTAL IMPLEMENTED $13,478 $22,640 $1,055
38,394
kWh
$5,286
-
kW-mo/yr
- $7,137
-
Tgal
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs