ITAC Assessment: MS0008
ITAC logo
ITAC Assessment: MS0008
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Trolling Motors
NAICS
n/a
SIC 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 100,000
ft2
Annual Production 150,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,497 1,248,535
kWh
Natural Gas $12,703 3,047
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,324 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4131: Size electric motors for peak operating efficiency $5,885 $1,000 $5,885
68,581
kWh
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $6,252 $10,100 - $6,252
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,373 $502 $1,373
16,413
kWh
-
04 2.2437: Recover waste heat from equipment $428 $1,000 - $428
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $164 $116 $164
2,052
kWh
-
06 2.4133: Use most efficient type of electric motors $222 $700 $222
2,345
kWh
-
TOTAL RECOMMENDED $14,324 $13,418 $7,644
89,391
kWh
$6,680
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs