ITAC Assessment: SD0407
ITAC logo
ITAC Assessment: SD0407
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product PH Sensors
NAICS 334513: Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 60,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 2,448
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,655 1,327,114
kWh
Electricity Demand $33,016 3,796
kW-mo/yr
Electricity Fees $7,167 -
Natural Gas $12,570 1,323
MMBtu
Other Energy $389 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,859 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,062

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,517 $5,878 $12,517
110,278
kWh
-
02 2.7229: Air condition only space necessary $4,807 - $4,807
42,355
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,196 $13,699 $3,100
27,315
kWh
$1,096
-
kW-mo/yr
04 2.4133: Use most efficient type of electric motors $4,008 $7,140 $3,408
30,034
kWh
$600
-
kW-mo/yr
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,341 $1,374 $2,341
20,626
kWh
-
06 2.7145: Install skylights $990 $2,940 $730
6,435
kWh
$260
-
kW-mo/yr
TOTAL RECOMMENDED $28,859 $31,031 $26,903
237,043
kWh
$1,956
-
kW-mo/yr
TOTAL IMPLEMENTED $23,062 $28,091 $21,366
188,253
kWh
$1,696
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs