| Assessment Year | 1999 |
|---|---|
| Principal Product | Grinded and Machined Parts |
| NAICS |
n/a
|
| SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 125 |
| Plant Area |
78,463
ft2
|
| Annual Production | 1,920,000
pieces
|
| Production Hrs. Annual | 5,355
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $99,762 | 2,276,964 |
kWh
|
$0.044 |
| Electricity Demand | $103,974 | 8,588 |
kW-mo/yr
|
$12.11 |
| Electricity Fees | $29,964 | - |
|
- |
| Natural Gas | $45,590 | 16,218 |
MMBtu
|
$2.81 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $14,440 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,476 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4322: Use or replace with energy efficient substitutes | $4,546 | $13,122 |
$1,786
38,687
kWh
|
$2,760
-
kW-mo/yr
|
- | - | - | |
| 02 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $4,263 | $500 | - | - | - | - | $4,263 | |
| 03 | 3.7137: Replace cloth rags with paper towels | $1,981 | - | - | - | - | $1,981 | - | |
| 04 | 2.7314: Reduce ventilation air | $1,508 | $1,000 |
$318
6,741
kWh
|
- |
$1,190
-
MMBtu
|
- | - | |
| 05 | 2.2515: Use optimum thickness insulation | $1,212 | $1,538 | - | - |
$1,212
-
MMBtu
|
- | - | |
| 06 | 2.2437: Recover waste heat from equipment | $474 | $500 | - | - |
$474
-
MMBtu
|
- | - | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $456 | $740 |
$198
4,396
kWh
|
$258
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $14,440 | $17,400 |
$2,302
49,824
kWh
|
$3,018
-
kW-mo/yr
|
$2,876
-
MMBtu
|
$1,981 | $4,263 | ||
| TOTAL IMPLEMENTED | $5,476 | $14,362 |
$1,984
43,083
kWh
|
$3,018
-
kW-mo/yr
|
$474
-
MMBtu
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs