Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Grinded and Machined Parts
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 78,463
ft2
Annual Production 1,920,000
pieces
Production Hrs. Annual 5,355
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,762 2,276,964
kWh
Electricity Demand $103,974 8,588
kW-mo/yr
Electricity Fees $29,964 -
Natural Gas $45,590 16,218
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,440 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,476

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4322: Use or replace with energy efficient substitutes $4,546 $13,122 $1,786
38,687
kWh
$2,760
-
kW-mo/yr
- - -
02 3.2123: Convert to high volume low pressure (hvlp) paint guns $4,263 $500 - - - - $4,263
03 3.7137: Replace cloth rags with paper towels $1,981 - - - - $1,981 -
04 2.7314: Reduce ventilation air $1,508 $1,000 $318
6,741
kWh
- $1,190
-
MMBtu
- -
05 2.2515: Use optimum thickness insulation $1,212 $1,538 - - $1,212
-
MMBtu
- -
06 2.2437: Recover waste heat from equipment $474 $500 - - $474
-
MMBtu
- -
07 2.4221: Install compressor air intakes in coolest locations $456 $740 $198
4,396
kWh
$258
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $14,440 $17,400 $2,302
49,824
kWh
$3,018
-
kW-mo/yr
$2,876
-
MMBtu
$1,981 $4,263
TOTAL IMPLEMENTED $5,476 $14,362 $1,984
43,083
kWh
$3,018
-
kW-mo/yr
$474
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs