ITAC Assessment: WI0346
ITAC logo
ITAC Assessment: WI0346
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Fruit Juices and Concentrates
NAICS
n/a
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $100
M
to 500
M
# of Employees 120
Plant Area 170,000
ft2
Annual Production 15,000
Tgal
Production Hrs. Annual 6,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $400,758 11,949,297
kWh
Electricity Demand $293,315 21,104
kW-mo/yr
Electricity Fees $104,922 -
Natural Gas $68,722 19,033
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $342,377 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,224

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $128,017 $420,000 $127,080
3,599,941
kWh
$105,336
-
kW-mo/yr
$(-100,199.0)
-
MMBtu
$(-4,200.0)
02 2.1233: Analyze flue gas for proper air/fuel ratio $5,551 $500 - - $5,551
-
MMBtu
-
03 4.441: Install automatic packing equipment $129,034 $30,000 $(-474.0)
(-13,482)
kWh
$(-492.0)
-
kW-mo/yr
- $130,000
04 4.441: Install automatic packing equipment $65,000 $140,000 - - - $65,000
05 2.3132: Recharge batteries on during off-peak demand periods $10,102 $6,600 - $10,102
-
kW-mo/yr
- -
06 2.4221: Install compressor air intakes in coolest locations $2,189 $1,480 $1,350
38,101
kWh
$839
-
kW-mo/yr
- -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,593 $508 $1,004
28,429
kWh
$589
-
kW-mo/yr
- -
08 2.7135: Install occupancy sensors $891 $1,400 $399
11,430
kWh
$492
-
kW-mo/yr
- -
TOTAL RECOMMENDED $342,377 $600,488 $129,359
3,664,419
kWh
$116,866
-
kW-mo/yr
$(-94,648.0)
-
MMBtu
$190,800
TOTAL IMPLEMENTED $10,224 $3,888 $2,753
77,960
kWh
$1,920
-
kW-mo/yr
$5,551
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs