ITAC Assessment: WI0342
ITAC logo
ITAC Assessment: WI0342
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Electro Mechanical and Refractory Fiber Products
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 110,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,250
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,305 1,000,293
kWh
Electricity Demand $42,947 6,391
kW-mo/yr
Electricity Fees $5,988 -
Natural Gas $70,157 14,482
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $62,565 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,362

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 4.521: Clear and rent existing space $57,832 $9,205 - - - $57,832
02 2.2437: Recover waste heat from equipment $2,018 $1,200 - - $2,018
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,027 $3,698 $568
16,120
kWh
$459
-
kW-mo/yr
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $757 $500 - - $757
-
MMBtu
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $605 $959 $307
8,792
kWh
$298
-
kW-mo/yr
- -
06 2.4221: Install compressor air intakes in coolest locations $326 $1,380 $157
4,396
kWh
$169
-
kW-mo/yr
- -
TOTAL RECOMMENDED $62,565 $16,942 $1,032
29,308
kWh
$926
-
kW-mo/yr
$2,775
-
MMBtu
$57,832
TOTAL IMPLEMENTED $1,362 $1,459 $307
8,792
kWh
$298
-
kW-mo/yr
$757
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs