Assessment Year | 1999 |
---|---|
Principal Product | Electro Mechanical and Refractory Fiber Products |
NAICS |
n/a
|
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
110,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $33,305 | 1,000,293 |
kWh
|
$0.033 |
Electricity Demand | $42,947 | 6,391 |
kW-mo/yr
|
$6.72 |
Electricity Fees | $5,988 | - |
|
- |
Natural Gas | $70,157 | 14,482 |
MMBtu
|
$4.84 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $62,565 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,362 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.521: Clear and rent existing space | $57,832 | $9,205 | - | - | - | $57,832 | |
02 | 2.2437: Recover waste heat from equipment | $2,018 | $1,200 | - | - |
$2,018
-
MMBtu
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,027 | $3,698 |
$568
16,120
kWh
|
$459
-
kW-mo/yr
|
- | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $757 | $500 | - | - |
$757
-
MMBtu
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $605 | $959 |
$307
8,792
kWh
|
$298
-
kW-mo/yr
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $326 | $1,380 |
$157
4,396
kWh
|
$169
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $62,565 | $16,942 |
$1,032
29,308
kWh
|
$926
-
kW-mo/yr
|
$2,775
-
MMBtu
|
$57,832 | ||
TOTAL IMPLEMENTED | $1,362 | $1,459 |
$307
8,792
kWh
|
$298
-
kW-mo/yr
|
$757
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs