ITAC Assessment: ME0216
ITAC logo
ITAC Assessment: ME0216
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Wooden Flatware
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 325
Plant Area 75,000
ft2
Annual Production 600,000
units
Production Hrs. Annual 4,000
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $255,523 4,076,788
kWh
Electricity Demand $96,382 13,105
kW-mo/yr
Electricity Fees $2,542 -
LPG $3,958 297
MMBtu
Fuel Oil #2 $7,920 1,456
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,678 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,315

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 4.423: Move product using mechanical means $15,456 $4,939 - - - - $15,456
02 2.7142: Utilize higher efficiency lamps and/or ballasts $8,574 $39,437 $6,678
111,372
kWh
$1,896
-
kW-mo/yr
- - -
03 2.2113: Repair or replace steam traps $3,930 $2,800 - - $3,930
-
MMBtu
- -
04 2.4133: Use most efficient type of electric motors $3,736 $7,565 $2,765
46,014
kWh
$971
-
kW-mo/yr
- - -
05 2.4221: Install compressor air intakes in coolest locations $1,140 $650 $1,140
19,050
kWh
- - - -
06 2.4239: Eliminate or reduce compressed air usage $438 $735 $438
6,155
kWh
- - - -
07 2.8121: Apply for tax-free status for energy purchases $426 - - - - - $426
08 2.2511: Insulate bare equipment $247 $400 - - $247
-
MMBtu
- -
09 2.8121: Apply for tax-free status for energy purchases $211 - - - - - $211
10 3.5212: Regrind, reuse, or sell scrap plastic parts $520 - - - - $520
-
lb
-
TOTAL RECOMMENDED $34,678 $56,526 $11,021
182,591
kWh
$2,867
-
kW-mo/yr
$4,177
-
MMBtu
$520
-
lb
$16,093
TOTAL IMPLEMENTED $17,315 $50,537 $9,881
163,541
kWh
$2,867
-
kW-mo/yr
$3,930
-
MMBtu
- $637
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs