ITAC Assessment: WI0341
ITAC logo
ITAC Assessment: WI0341
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Packaging Cartons
NAICS
n/a
SIC 2652: Setup Paperboard Boxes
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 221,600
ft2
Annual Production 2,857
ton
Production Hrs. Annual 4,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $90,339 2,303,634
kWh
Electricity Demand $77,808 8,456
kW-mo/yr
Electricity Fees $10,653 -
Natural Gas $26,079 6,332
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,380 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,174

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 4.211: Consider use / purchase of bulk materials where possible $40,755 - - - - - - $40,755 -
02 3.8143: Recycle cleaning solvent and reuse $4,636 $7,000 $(-4.0)
(-293)
kWh
- - $(-1,080.0) - - $5,720
03 2.7447: Install vinyl strip / high speed / air curtain doors $2,404 $8,000 $(-290.0)
(-7,034)
kWh
- $2,694
-
MMBtu
- - - -
04 2.7447: Install vinyl strip / high speed / air curtain doors $648 $1,086 - - $648
-
MMBtu
- - - -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,991 - $1,148
27,843
kWh
$843
-
kW-mo/yr
- - - - -
06 3.7137: Replace cloth rags with paper towels $1,824 - - - - - $1,824 - -
07 2.3132: Recharge batteries on during off-peak demand periods $1,647 $300 - $1,647
-
kW-mo/yr
- - - - -
08 2.3134: Shift from daytime to nighttime operation $1,475 - - $2,175
-
kW-mo/yr
- $(-700.0) - - -
TOTAL RECOMMENDED $55,380 $16,386 $854
20,516
kWh
$4,665
-
kW-mo/yr
$3,342
-
MMBtu
$(-1,780.0) $1,824 $40,755 $5,720
TOTAL IMPLEMENTED $6,174 $9,386 $(-290.0)
(-7,034)
kWh
$3,822
-
kW-mo/yr
$3,342
-
MMBtu
$(-700.0) - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs