Assessment Year | 2002 |
---|---|
Principal Product | Precast concrete |
NAICS |
n/a
|
SIC | 3272: Concrete Products, Except Block and Brick |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
2,600,000
ft2
|
Annual Production | 15
pieces
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $77,824 | 1,053,851 |
kWh
|
$0.074 |
Natural Gas | $133,364 | 21,169 |
MMBtu
|
$6.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $45,229 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,348 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $8,947 | $9,900 | - |
$8,947
-
MMBtu
|
- | - | - | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,136 | $4,000 | - |
$3,136
-
MMBtu
|
- | - | - | - | |
03 | 2.2136: Install / repair insulation on steam lines | $9,648 | $6,750 | - |
$9,648
-
MMBtu
|
- | - | - | - | |
04 | 2.2511: Insulate bare equipment | $4,152 | $1,635 | - |
$4,152
-
MMBtu
|
- | - | - | - | |
05 | 3.4116: Meter recycled water (to reduce sewer charges) | $7,873 | $300 | - | - |
$8,273
-
Tgal
|
- | $(-400.0) | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,624 | $2,468 |
$2,771
37,440
kWh
|
- | - | - | - | $(-147.0) | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,070 | $200 |
$2,070
27,984
kWh
|
- | - | - | - | - | |
08 | 4.632: Change operating conditions | $4,200 | $7,500 | - | - | - | $4,200 | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,632 | $440 |
$246
3,329
kWh
|
- | - | $224 | - | $1,162 | |
10 | 2.7135: Install occupancy sensors | $798 | $1,287 |
$798
10,783
kWh
|
- | - | - | - | - | |
11 | 2.6232: Install set-back timers | $149 | $312 | - |
$149
-
MMBtu
|
- | - | - | - | |
TOTAL RECOMMENDED | $45,229 | $34,792 |
$5,885
79,536
kWh
|
$26,032
-
MMBtu
|
$8,273
-
Tgal
|
$4,424 | $(-400.0) | $1,015 | ||
TOTAL IMPLEMENTED | $14,348 | $3,720 |
$5,087
68,753
kWh
|
$149
-
MMBtu
|
$8,273
-
Tgal
|
$224 | $(-400.0) | $1,015 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs