ITAC Assessment: OK0635
ITAC logo
ITAC Assessment: OK0635
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Precast concrete
NAICS
n/a
SIC 3272: Concrete Products, Except Block and Brick
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 2,600,000
ft2
Annual Production 15
pieces
Production Hrs. Annual 3,120
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,824 1,053,851
kWh
Natural Gas $133,364 21,169
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,229 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,348

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.2414: Use waste heat from hot flue gases to preheat $8,947 $9,900 - $8,947
-
MMBtu
- - - -
02 2.1233: Analyze flue gas for proper air/fuel ratio $3,136 $4,000 - $3,136
-
MMBtu
- - - -
03 2.2136: Install / repair insulation on steam lines $9,648 $6,750 - $9,648
-
MMBtu
- - - -
04 2.2511: Insulate bare equipment $4,152 $1,635 - $4,152
-
MMBtu
- - - -
05 3.4116: Meter recycled water (to reduce sewer charges) $7,873 $300 - - $8,273
-
Tgal
- $(-400.0) -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,624 $2,468 $2,771
37,440
kWh
- - - - $(-147.0)
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,070 $200 $2,070
27,984
kWh
- - - - -
08 4.632: Change operating conditions $4,200 $7,500 - - - $4,200 - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,632 $440 $246
3,329
kWh
- - $224 - $1,162
10 2.7135: Install occupancy sensors $798 $1,287 $798
10,783
kWh
- - - - -
11 2.6232: Install set-back timers $149 $312 - $149
-
MMBtu
- - - -
TOTAL RECOMMENDED $45,229 $34,792 $5,885
79,536
kWh
$26,032
-
MMBtu
$8,273
-
Tgal
$4,424 $(-400.0) $1,015
TOTAL IMPLEMENTED $14,348 $3,720 $5,087
68,753
kWh
$149
-
MMBtu
$8,273
-
Tgal
$224 $(-400.0) $1,015
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs