ITAC Assessment: WI0333
ITAC logo
ITAC Assessment: WI0333
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Continuous Computer Forms
NAICS
n/a
SIC 2761: Manifold Business Forms
Sales Range $10
M
to 50
M
# of Employees 56
Plant Area 100,000
ft2
Annual Production 35,000,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,002 2,645,662
kWh
Electricity Demand $26,081 5,086
kW-mo/yr
Electricity Fees $5,738 -
Natural Gas $17,876 3,963
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,713 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,727

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
01 4.441: Install automatic packing equipment $22,275 $40,000 - - - - $22,275 - -
02 3.7137: Replace cloth rags with paper towels $2,353 - - - - - - $2,353 -
03 3.8142: Distill contaminated solvents for reuse $1,775 $4,600 - - $2,200
-
gal
$(-96.0)
-
lb
$(-230.0) - $(-99.0)
04 2.8113: Purchase gas directly from a contract gas supplier $1,978 $500 - - - - - $1,978 -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,597 $120 $1,270
48,359
kWh
$327
-
kW-mo/yr
- - - - -
06 2.7144: Install spectral reflectors / delamp $1,175 - $943
36,049
kWh
$232
-
kW-mo/yr
- - - - -
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,149 $2,000 $676
25,791
kWh
$473
-
kW-mo/yr
- - - - -
08 2.3132: Recharge batteries on during off-peak demand periods $847 $400 - $847
-
kW-mo/yr
- - - - -
09 2.4221: Install compressor air intakes in coolest locations $456 $640 $339
12,896
kWh
$117
-
kW-mo/yr
- - - - -
10 2.8112: Combine utility meters $108 $200 - - - - - $108 -
TOTAL RECOMMENDED $33,713 $48,460 $3,228
123,095
kWh
$1,996
-
kW-mo/yr
$2,200
-
gal
$(-96.0)
-
lb
$22,045 $4,439 $(-99.0)
TOTAL IMPLEMENTED $3,727 $720 $2,213
84,408
kWh
$1,406
-
kW-mo/yr
- - - $108 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs