Assessment Year | 1998 |
---|---|
Principal Product | Lead Castings |
NAICS |
n/a
|
SIC | 3053: Gaskets, Packing, and Sealing Devices |
Sales Range | $5 M to 10M |
# of Employees | 60 |
Plant Area |
50,000
ft2
|
Annual Production | 1,200,000
lb
|
Production Hrs. Annual | 4,000
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $25,311 | 804,807 |
kWh
|
$0.031 |
Electricity Demand | $29,636 | 3,489 |
kW-mo/yr
|
$8.49 |
Electricity Fees | $3,759 | - |
|
- |
Natural Gas | $56,153 | 13,002 |
MMBtu
|
$4.32 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $69,243 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $53,129 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Demand Savings | Natural Gas Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.431: Train operators for maximum operating efficiency | $45,000 | - | - | - | - | $45,000 | - | |
02 | 2.2426: Use waste heat from flue gases to heat space conditioning air | $6,295 | $11,500 | - |
$6,295
-
MMBtu
|
- | - | - | |
03 | 2.8113: Purchase gas directly from a contract gas supplier | $6,880 | $500 | - | - | - | - | $6,880 | |
04 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $3,975 | $8,500 | - | - |
$3,975
-
lb
|
- | - | |
05 | 3.7137: Replace cloth rags with paper towels | $1,218 | - | - | - | - | - | $1,218 | |
06 | 2.3134: Shift from daytime to nighttime operation | $3,729 | - |
$3,729
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.3132: Recharge batteries on during off-peak demand periods | $1,249 | $300 |
$1,249
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $897 | $608 | - |
$897
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $69,243 | $21,408 |
$4,978
-
kW-mo/yr
|
$7,192
-
MMBtu
|
$3,975
-
lb
|
$45,000 | $8,098 | ||
TOTAL IMPLEMENTED | $53,129 | $800 |
$1,249
-
kW-mo/yr
|
- | - | $45,000 | $6,880 | ||
Yearly Savings* | Imp'd Cost* | Electricity Demand Savings | Natural Gas Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs