ITAC Assessment: WI0325
ITAC logo
ITAC Assessment: WI0325
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Cream Cheese and Butter
NAICS
n/a
SIC 2020:
Sales Range $50
M
to 100
M
# of Employees 95
Plant Area 156,000
ft2
Annual Production 38,000,000
lb
Production Hrs. Annual 6,144
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $166,944 7,354,045
kWh
Electricity Demand $113,533 15,702
kW-mo/yr
Electricity Fees $3,765 -
Natural Gas $245,374 64,076
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $359,444 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,848

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
01 4.441: Install automatic packing equipment $336,000 $240,000 - - - $336,000 -
02 2.1233: Analyze flue gas for proper air/fuel ratio $7,848 $500 - - $7,848
-
MMBtu
- -
03 2.2414: Use waste heat from hot flue gases to preheat $7,598 $10,000 - - $7,598
-
MMBtu
- -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,590 - - $5,790
-
kW-mo/yr
- $(-200.0) -
05 4.321: Optimize production lot sizes and inventories $1,652 - - - - - $1,652
06 2.4221: Install compressor air intakes in coolest locations $756 $740 $368
15,240
kWh
$388
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $359,444 $251,240 $368
15,240
kWh
$6,178
-
kW-mo/yr
$15,446
-
MMBtu
$335,800 $1,652
TOTAL IMPLEMENTED $7,848 $500 - - $7,848
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs