ITAC Assessment: WI0317
ITAC logo
ITAC Assessment: WI0317
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Screws and cold headed fasteners
NAICS
n/a
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $10
M
to 50
M
# of Employees 104
Plant Area 77,000
ft2
Annual Production 250,000,000
pieces
Production Hrs. Annual 4,870
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $116,323 2,664,127
kWh
Electricity Demand $85,185 6,990
kW-mo/yr
Electricity Fees $4,485 -
Natural Gas $16,733 4,484
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,208 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,405

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,682 $1,342 $778
17,878
kWh
$904
-
kW-mo/yr
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $986 - $456
10,551
kWh
$530
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $597 $2,250 $597
13,775
kWh
- -
04 4.321: Optimize production lot sizes and inventories $1,611 - - - $1,611
05 2.4221: Install compressor air intakes in coolest locations $1,138 $740 $431
9,965
kWh
$707
-
kW-mo/yr
-
06 2.3132: Recharge batteries on during off-peak demand periods $794 - - $794
-
kW-mo/yr
-
07 3.7137: Replace cloth rags with paper towels $400 - - - $400
TOTAL RECOMMENDED $7,208 $4,332 $2,262
52,169
kWh
$2,935
-
kW-mo/yr
$2,011
TOTAL IMPLEMENTED $2,405 - - $794
-
kW-mo/yr
$1,611
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs