ITAC Assessment: WI0315
ITAC logo
ITAC Assessment: WI0315
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Powder Metallurgy Components
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 70,000
ft2
Annual Production 100,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $206,146 9,676,143
kWh
Electricity Demand $96,413 19,902
kW-mo/yr
Electricity Fees $(-2,085.0) -
Natural Gas $8,323 1,468
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $136,517 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 4.445: Install equipment to move product $82,125 $50,000 - - - - - - $82,125 - - -
02 3.4114: Replace city water with recycled water via cooling tower $33,613 $68,000 $(-5,199.0)
(-171,161)
kWh
- - $41,624
-
Tgal
- - - $(-2,812.0) - -
03 3.4113: Treat and reuse rinse waters $7,064 $1,475 - - - $8,564
-
Tgal
- - - - - $(-1,500.0)
04 3.8142: Distill contaminated solvents for reuse $4,722 $14,000 - - - - $8,575
-
gal
$(-543.0)
-
lb
$(-2,010.0) - - $(-1,300.0)
05 3.8121: Cover containers to minimize evaporative losses $1,300 - - - - - - - - - - $1,300
06 2.2511: Insulate bare equipment $3,542 $1,362 $2,869
128,077
kWh
$673
-
kW-mo/yr
- - - - - - - -
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,180 - - - - - - $2,180
-
lb
- - - -
08 2.7447: Install vinyl strip / high speed / air curtain doors $1,040 $1,424 - - $1,040
-
MMBtu
- - - - - - -
09 4.321: Optimize production lot sizes and inventories $931 - - - - - - - - - $931 -
TOTAL RECOMMENDED $136,517 $136,261 $(-2,330.0)
(-43,084)
kWh
$673
-
kW-mo/yr
$1,040
-
MMBtu
$50,188
-
Tgal
$8,575
-
gal
$1,637
-
lb
$80,115 $(-2,812.0) $931 $(-1,500.0)
TOTAL IMPLEMENTED - - - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs