ITAC Assessment: WI0298
ITAC logo
ITAC Assessment: WI0298
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Electric Resistors and Switches
NAICS
n/a
SIC 3676: Electronic Resistors
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 165,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,375
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $214,446 5,791,032
kWh
Electricity Demand $226,949 15,971
kW-mo/yr
Electricity Fees $3,226 -
Natural Gas $69,466 19,060
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $88,739 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $54,634

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $29,190 $30,000 $13,331
342,614
kWh
$30,072
-
kW-mo/yr
$(-14,213.0)
-
MMBtu
- - -
02 2.4221: Install compressor air intakes in coolest locations $2,867 $1,480 $946
24,326
kWh
$1,921
-
kW-mo/yr
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,444 $120 $807
20,809
kWh
$637
-
kW-mo/yr
- - - -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $25,193 - - $33,593
-
kW-mo/yr
- - $(-8,400.0) -
05 4.441: Install automatic packing equipment $24,000 $20,000 - - - - $24,000 -
06 3.4114: Replace city water with recycled water via cooling tower $3,119 $18,000 $(-4,181.0)
(-55,979)
kWh
- - $7,800
-
Tgal
$(-500.0) -
07 3.4151: Minimize water usage $2,100 $1,000 - - - $2,100
-
Tgal
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $686 - $235
6,155
kWh
$451
-
kW-mo/yr
- - - -
09 4.321: Optimize production lot sizes and inventories $140 - - - - - - $140
TOTAL RECOMMENDED $88,739 $70,600 $11,138
337,925
kWh
$66,674
-
kW-mo/yr
$(-14,213.0)
-
MMBtu
$9,900
-
Tgal
$15,100 $140
TOTAL IMPLEMENTED $54,634 $50,120 $14,138
363,423
kWh
$30,709
-
kW-mo/yr
$(-14,213.0)
-
MMBtu
- $24,000 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs