ITAC Assessment: WI0296
ITAC logo
ITAC Assessment: WI0296
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Leather
NAICS
n/a
SIC 3111: Leather Tanning and Finishing
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 75,000
ft2
Annual Production 370,000
pieces
Production Hrs. Annual 6,275
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,614 1,864,009
kWh
Electricity Demand $38,748 5,095
kW-mo/yr
Electricity Fees $(-4,264.0) -
Natural Gas $112,805 29,239
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,153 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,261

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
01 4.441: Install automatic packing equipment $24,000 $19,000 - - - - $24,000
02 2.4131: Size electric motors for peak operating efficiency $6,364 $5,400 $1,912
68,581
kWh
$4,452
-
kW-mo/yr
- - -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,796 - - $3,796
-
kW-mo/yr
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,479 $6,750 $1,143
41,032
kWh
$1,336
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $725 $1,608 $499
17,878
kWh
$226
-
kW-mo/yr
- - -
06 2.7314: Reduce ventilation air $699 $500 $69
2,345
kWh
- $630
-
MMBtu
- -
07 2.4221: Install compressor air intakes in coolest locations $617 $640 $424
15,240
kWh
$193
-
kW-mo/yr
- - -
08 3.4151: Minimize water usage $1,473 $900 $(-1,293.0)
(-43,669)
kWh
- - $2,766
-
Tgal
-
TOTAL RECOMMENDED $40,153 $34,798 $2,754
101,407
kWh
$10,003
-
kW-mo/yr
$630
-
MMBtu
$2,766
-
Tgal
$24,000
TOTAL IMPLEMENTED $9,261 $8,408 $1,187
45,135
kWh
$4,678
-
kW-mo/yr
$630
-
MMBtu
$2,766
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs