ITAC Assessment: WI0291
ITAC logo
ITAC Assessment: WI0291
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Custom Sheet Metal Products
NAICS
n/a
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 245
Plant Area 300,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,210
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,818 5,492,380
kWh
Electricity Demand $120,577 14,780
kW-mo/yr
Electricity Fees $4,750 -
Natural Gas $111,568 32,973
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,753 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,021

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 4.452: Eliminate shift $23,000 $5,000 - - - - $23,000
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,229 $20,892 $5,013
191,970
kWh
$2,216
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,099 $360 $4,922
188,453
kWh
$2,177
-
kW-mo/yr
- - -
04 2.2414: Use waste heat from hot flue gases to preheat $3,451 $10,000 - - $3,451
-
MMBtu
- -
05 2.4221: Install compressor air intakes in coolest locations $2,429 $740 $1,187
45,428
kWh
$1,242
-
kW-mo/yr
- - -
06 2.6218: Turn off equipment when not in use $1,693 - $1,693
64,771
kWh
- - - -
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $15,852 - - - - $15,852
-
lb
-
TOTAL RECOMMENDED $60,753 $36,992 $12,815
490,622
kWh
$5,635
-
kW-mo/yr
$3,451
-
MMBtu
$15,852
-
lb
$23,000
TOTAL IMPLEMENTED $16,021 $21,252 $11,628
445,194
kWh
$4,393
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs