Assessment Year | 1996 |
---|---|
Principal Product | Metal Stamping |
NAICS |
n/a
|
SIC | 3465: Automotive Stampings |
Sales Range | $10 M to 50M |
# of Employees | 54 |
Plant Area |
50,000
ft2
|
Annual Production | 10,000,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $74,368 | 1,276,964 |
kWh
|
$0.058 |
Electricity Demand | $31,033 | 3,598 |
kW-mo/yr
|
$8.63 |
Electricity Fees | $1,218 | - |
|
- |
Natural Gas | $11,673 | 2,221 |
MMBtu
|
$5.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,871 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,862 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.8121: Apply for tax-free status for energy purchases | $2,734 | - | - | - | - | - | $2,734 | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,794 | - |
$989
33,118
kWh
|
$805
-
kW-mo/yr
|
- | - | - | |
03 | 2.8113: Purchase gas directly from a contract gas supplier | $1,714 | $500 | - | - | - | - | $1,714 | |
04 | 3.6192: Use a less expensive method of waste removal | $1,440 | - | - | - | - |
$1,440
-
lb
|
- | |
05 | 2.7261: Install timers and/or thermostats | $1,204 | $800 | - | - |
$1,204
-
MMBtu
|
- | - | |
06 | 2.2437: Recover waste heat from equipment | $1,165 | $2,000 | - | - |
$1,165
-
MMBtu
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $927 | $640 |
$329
11,137
kWh
|
$598
-
kW-mo/yr
|
- | - | - | |
08 | 2.7243: Improve air circulation with destratification fans / other methods | $917 | $3,040 |
$(-184.0)
(-6,155)
kWh
|
- |
$1,101
-
MMBtu
|
- | - | |
09 | 2.1123: Install automatic stack damper | $701 | $1,300 | - | - |
$701
-
MMBtu
|
- | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $275 | $246 |
$188
11,723
kWh
|
$87
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $12,871 | $8,526 |
$1,322
49,823
kWh
|
$1,490
-
kW-mo/yr
|
$4,171
-
MMBtu
|
$1,440
-
lb
|
$4,448 | ||
TOTAL IMPLEMENTED | $4,862 | $4,186 |
$1,506
55,978
kWh
|
$1,490
-
kW-mo/yr
|
$1,866
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs