ITAC Assessment: WI0280
ITAC logo
ITAC Assessment: WI0280
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Metal Stamping
NAICS
n/a
SIC 3465: Automotive Stampings
Sales Range $10
M
to 50
M
# of Employees 54
Plant Area 50,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,368 1,276,964
kWh
Electricity Demand $31,033 3,598
kW-mo/yr
Electricity Fees $1,218 -
Natural Gas $11,673 2,221
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,871 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,862

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $2,734 - - - - - $2,734
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,794 - $989
33,118
kWh
$805
-
kW-mo/yr
- - -
03 2.8113: Purchase gas directly from a contract gas supplier $1,714 $500 - - - - $1,714
04 3.6192: Use a less expensive method of waste removal $1,440 - - - - $1,440
-
lb
-
05 2.7261: Install timers and/or thermostats $1,204 $800 - - $1,204
-
MMBtu
- -
06 2.2437: Recover waste heat from equipment $1,165 $2,000 - - $1,165
-
MMBtu
- -
07 2.4221: Install compressor air intakes in coolest locations $927 $640 $329
11,137
kWh
$598
-
kW-mo/yr
- - -
08 2.7243: Improve air circulation with destratification fans / other methods $917 $3,040 $(-184.0)
(-6,155)
kWh
- $1,101
-
MMBtu
- -
09 2.1123: Install automatic stack damper $701 $1,300 - - $701
-
MMBtu
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $275 $246 $188
11,723
kWh
$87
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $12,871 $8,526 $1,322
49,823
kWh
$1,490
-
kW-mo/yr
$4,171
-
MMBtu
$1,440
-
lb
$4,448
TOTAL IMPLEMENTED $4,862 $4,186 $1,506
55,978
kWh
$1,490
-
kW-mo/yr
$1,866
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs