ITAC Assessment: WI0272
ITAC logo
ITAC Assessment: WI0272
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Wood moulding, lumber/trim
NAICS
n/a
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 76,000
ft2
Annual Production 1,000,000
thousand feet
Production Hrs. Annual 4,362
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,235 996,483
kWh
Electricity Demand $44,453 3,657
kW-mo/yr
Electricity Fees $(-977.0) -
Natural Gas $9,482 2,969
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,185 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,480

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,159 $13,000 $3,159
80,891
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,696 $5,280 $892
22,860
kWh
$804
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $414 $683 $200
4,982
kWh
$214
-
kW-mo/yr
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,511 $960 $756
19,343
kWh
$755
-
kW-mo/yr
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $251 - $113
2,931
kWh
$138
-
kW-mo/yr
- -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $1,500 - - - - $1,500
-
lb
07 2.3134: Shift from daytime to nighttime operation $815 - - $815
-
kW-mo/yr
- -
08 2.1132: Repair faulty louvers and dampers $628 $1,100 - - $628
-
MMBtu
-
09 2.7261: Install timers and/or thermostats $211 $200 - - $211
-
MMBtu
-
TOTAL RECOMMENDED $10,185 $21,223 $5,120
131,007
kWh
$2,726
-
kW-mo/yr
$839
-
MMBtu
$1,500
-
lb
TOTAL IMPLEMENTED $1,480 $683 $313
7,913
kWh
$1,167
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs