Assessment Year | 1996 |
---|---|
Principal Product | Projectile and Cartrige Cases |
NAICS |
n/a
|
SIC | 3483: Ammunition, Except for Small Arms |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
300,000
ft2
|
Annual Production | 4,000,000
pieces
|
Production Hrs. Annual | 4,125
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $237,114 | 9,232,122 |
kWh
|
$0.026 |
Electricity Demand | $172,017 | 24,172 |
kW-mo/yr
|
$7.12 |
Electricity Fees | $5,637 | - |
|
- |
Natural Gas | $265,781 | 100,386 |
MMBtu
|
$2.65 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $65,120 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,958 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $27,900 | $4,000 | - | - | - | - |
$27,900
-
gal
|
- | |
02 | 2.6232: Install set-back timers | $26,926 | $1,100 | - | - |
$26,926
-
MMBtu
|
- | - | - | |
03 | 3.6192: Use a less expensive method of waste removal | $3,375 | - | - | - | - | - | - |
$3,375
-
lb
|
|
04 | 3.4151: Minimize water usage | $1,975 | - | - | - | - |
$1,975
-
Tgal
|
- | - | |
05 | 2.2515: Use optimum thickness insulation | $1,431 | $2,160 | - | - |
$1,431
-
MMBtu
|
- | - | - | |
06 | 2.2621: Modify refrigeration system to operate at a lower pressure | $1,370 | $5,000 |
$601
22,274
kWh
|
$769
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $596 | $700 | - | - |
$596
-
MMBtu
|
- | - | - | |
08 | 2.7221: Lower temperature during the winter season and vice-versa | $569 | - | - | - |
$569
-
MMBtu
|
- | - | - | |
09 | 2.7135: Install occupancy sensors | $370 | $675 |
$149
5,569
kWh
|
$221
-
kW-mo/yr
|
- | - | - | - | |
10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $335 | - |
$164
6,155
kWh
|
$171
-
kW-mo/yr
|
- | - | - | - | |
11 | 2.1233: Analyze flue gas for proper air/fuel ratio | $273 | $500 | - | - |
$273
-
MMBtu
|
- | - | - | |
TOTAL RECOMMENDED | $65,120 | $14,135 |
$914
33,998
kWh
|
$1,161
-
kW-mo/yr
|
$29,795
-
MMBtu
|
$1,975
-
Tgal
|
$27,900
-
gal
|
$3,375
-
lb
|
||
TOTAL IMPLEMENTED | $5,958 | $500 |
$164
6,155
kWh
|
$171
-
kW-mo/yr
|
$273
-
MMBtu
|
$1,975
-
Tgal
|
- |
$3,375
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs