ITAC Assessment: WI0249
ITAC logo
ITAC Assessment: WI0249
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Steel Cylinders
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 9,000
ft2
Annual Production 100,000
thousand feet
Production Hrs. Annual 6,800
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,866 975,381
kWh
Natural Gas $20,925 7,565
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,399 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,153

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7447: Install vinyl strip / high speed / air curtain doors $1,906 $4,500 - $1,906
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,781 $150 $1,781
28,136
kWh
-
03 2.4314: Use synthetic lubricant $1,712 $500 $1,712
26,964
kWh
-
04 2.2437: Recover waste heat from equipment $1,153 $250 - $1,153
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $488 $97 $488
7,620
kWh
-
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $359 - $359
-
kWh
-
TOTAL RECOMMENDED $7,399 $5,497 $4,340
62,720
kWh
$3,059
-
MMBtu
TOTAL IMPLEMENTED $1,153 $250 - $1,153
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs