| Assessment Year | 1995 |
|---|---|
| Principal Product | Steel Cylinders |
| NAICS |
n/a
|
| SIC | 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds |
| Sales Range | $5 M to 10M |
| # of Employees | 50 |
| Plant Area |
9,000
ft2
|
| Annual Production | 100,000
thousand feet
|
| Production Hrs. Annual | 6,800
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $61,866 | 975,381 |
kWh
|
$0.063 |
| Natural Gas | $20,925 | 7,565 |
MMBtu
|
$2.77 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $7,399 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,153 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,906 | $4,500 | - |
$1,906
-
MMBtu
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,781 | $150 |
$1,781
28,136
kWh
|
- | |
| 03 | 2.4314: Use synthetic lubricant | $1,712 | $500 |
$1,712
26,964
kWh
|
- | |
| 04 | 2.2437: Recover waste heat from equipment | $1,153 | $250 | - |
$1,153
-
MMBtu
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $488 | $97 |
$488
7,620
kWh
|
- | |
| 06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $359 | - |
$359
-
kWh
|
- | |
| TOTAL RECOMMENDED | $7,399 | $5,497 |
$4,340
62,720
kWh
|
$3,059
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $1,153 | $250 | - |
$1,153
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs