ITAC Assessment: WI0240
ITAC logo
ITAC Assessment: WI0240
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Labels,Decals
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 320
Plant Area 88,700
ft2
Annual Production 6,000,000
thousand feet
Production Hrs. Annual 7,200
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $247,892 5,538,394
kWh
Natural Gas $32,765 6,488
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,333 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,085

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $6,229 $500 - - $6,229
02 2.2437: Recover waste heat from equipment $4,025 $300 - $4,025
-
MMBtu
-
03 2.4221: Install compressor air intakes in coolest locations $1,265 $640 $1,265
28,136
kWh
- -
04 2.7221: Lower temperature during the winter season and vice-versa $1,795 $400 - $1,795
-
MMBtu
-
05 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $1,019 $2,000 $1,019
38,687
kWh
- -
TOTAL RECOMMENDED $14,333 $3,840 $2,284
66,823
kWh
$5,820
-
MMBtu
$6,229
TOTAL IMPLEMENTED $7,085 $1,340 $1,265
28,136
kWh
$5,820
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs