ITAC Assessment: WI0229
ITAC logo
ITAC Assessment: WI0229
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Steel door frames
NAICS
n/a
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $1
M
to 5
M
# of Employees 100
Plant Area 70,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,428 822,978
kWh
Natural Gas $45,964 9,163
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,094 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,572

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $9,035 $500 - - $9,035
02 2.7447: Install vinyl strip / high speed / air curtain doors $4,344 $1,400 - $4,344
-
MMBtu
-
03 2.8121: Apply for tax-free status for energy purchases $987 - - - $987
04 2.4314: Use synthetic lubricant $500 - $500
7,913
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $228 - $228
3,517
kWh
- -
TOTAL RECOMMENDED $15,094 $1,900 $728
11,430
kWh
$4,344
-
MMBtu
$10,022
TOTAL IMPLEMENTED $4,572 $1,400 $228
3,517
kWh
$4,344
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs