Assessment Year | 2004 |
---|---|
Principal Product | Walk-In Coolers and Freezers |
NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
47,000
ft2
|
Annual Production | 600
pieces
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $29,299 | 604,097 |
kWh
|
$0.049 |
Electricity Demand | $10,329 | 1,957 |
kW-mo/yr
|
$5.28 |
Electricity Fees | $5,085 | - |
|
- |
Natural Gas | $15,400 | 1,994 |
MMBtu
|
$7.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $370,565 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $280,157 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 4.445: Install equipment to move product | $90,154 | $5,782 | - | - | $90,154 | |
02 | 4.623: Employ modular jigs to reduce process set-up time | $270,439 | $2,825 | - | - | $270,439 | |
03 | 2.6232: Install set-back timers | $6,531 | $3,832 | - |
$6,531
-
MMBtu
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,036 | $559 |
$2,228
49,896
kWh
|
- | $(-192.0) | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $265 | - |
$265
5,460
kWh
|
- | - | |
06 | 2.7135: Install occupancy sensors | $254 | $760 |
$254
5,242
kWh
|
- | - | |
07 | 2.2628: Utilize a less expensive cooling method | $886 | $139 |
$886
12,461
kWh
|
- | - | |
TOTAL RECOMMENDED | $370,565 | $13,897 |
$3,633
73,059
kWh
|
$6,531
-
MMBtu
|
$360,401 | ||
TOTAL IMPLEMENTED | $280,157 | $7,355 |
$3,379
67,817
kWh
|
$6,531
-
MMBtu
|
$270,247 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs