ITAC Assessment: WI0225
ITAC logo
ITAC Assessment: WI0225
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Al and Zi die casting/machining
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $5
M
to 10
M
# of Employees 190
Plant Area 148,000
ft2
Annual Production 4,000,000
lb
Production Hrs. Annual 7,200
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $298,468 5,412,368
kWh
Natural Gas $198,070 42,476
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $327,209 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,019

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.8121: Apply for tax-free status for energy purchases $19,333 - - - - $19,333
02 2.7111: Reduce illumination to minimum necessary levels $6,987 - $6,987
126,612
kWh
- - -
03 2.4221: Install compressor air intakes in coolest locations $2,909 $1,280 $2,909
52,755
kWh
- - -
04 2.2511: Insulate bare equipment $2,110 $1,365 - $2,110
-
MMBtu
- -
05 3.1191: Change procedures / equipment / operating conditions $291,000 $100,000 - - $291,000
-
lb
-
06 3.1191: Change procedures / equipment / operating conditions $4,870 $6,000 - - $4,870
-
lb
-
TOTAL RECOMMENDED $327,209 $108,645 $9,896
179,367
kWh
$2,110
-
MMBtu
$295,870
-
lb
$19,333
TOTAL IMPLEMENTED $5,019 $2,645 $2,909
52,755
kWh
$2,110
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs