| Assessment Year | 1994 |
|---|---|
| Principal Product | Al and Zi die casting/machining |
| NAICS |
n/a
|
| SIC | 3363: Aluminum Die-Castings |
| Sales Range | $5 M to 10M |
| # of Employees | 190 |
| Plant Area |
148,000
ft2
|
| Annual Production | 4,000,000
lb
|
| Production Hrs. Annual | 7,200
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $298,468 | 5,412,368 |
kWh
|
$0.055 |
| Natural Gas | $198,070 | 42,476 |
MMBtu
|
$4.66 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $327,209 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $5,019 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.8121: Apply for tax-free status for energy purchases | $19,333 | - | - | - | - | $19,333 | |
| 02 | 2.7111: Reduce illumination to minimum necessary levels | $6,987 | - |
$6,987
126,612
kWh
|
- | - | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $2,909 | $1,280 |
$2,909
52,755
kWh
|
- | - | - | |
| 04 | 2.2511: Insulate bare equipment | $2,110 | $1,365 | - |
$2,110
-
MMBtu
|
- | - | |
| 05 | 3.1191: Change procedures / equipment / operating conditions | $291,000 | $100,000 | - | - |
$291,000
-
lb
|
- | |
| 06 | 3.1191: Change procedures / equipment / operating conditions | $4,870 | $6,000 | - | - |
$4,870
-
lb
|
- | |
| TOTAL RECOMMENDED | $327,209 | $108,645 |
$9,896
179,367
kWh
|
$2,110
-
MMBtu
|
$295,870
-
lb
|
$19,333 | ||
| TOTAL IMPLEMENTED | $5,019 | $2,645 |
$2,909
52,755
kWh
|
$2,110
-
MMBtu
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs