ITAC Assessment: WI0215
ITAC logo
ITAC Assessment: WI0215
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Plating of silver, gold, nickel, and tin
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 40,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,367 1,443,728
kWh
Natural Gas $35,325 7,295
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,095 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,077

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.3312: Install efficient rectifiers $17,153 $28,400 $17,153
291,032
kWh
- -
02 2.7221: Lower temperature during the winter season and vice-versa $1,840 $800 - $1,840
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,325 $1,973 $1,325
15,533
kWh
- -
04 2.7447: Install vinyl strip / high speed / air curtain doors $848 $1,400 - $848
-
MMBtu
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $229 $500 - $229
-
MMBtu
-
06 3.6112: Use filter and drying oven to reduce sludge volume $9,700 $38,000 - - $9,700
-
lb
TOTAL RECOMMENDED $31,095 $71,073 $18,478
306,565
kWh
$2,917
-
MMBtu
$9,700
-
lb
TOTAL IMPLEMENTED $1,077 $1,900 - $1,077
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs